Temporary Runaround Trestle Railroad Bridge
for
Sale or Rent
Download FDF Flyer for the Bridge
Detour Structure. This 467-foot bridge is comprised of
ten spans, and is available immediately from our West
Greenwich, RI yard.
The structure was designed by Gannett Fleming to the
current AREMA specifications and fabricated by High
Steel Structures with full PennDOT shop inspection.
The 734-ton bridge was originally erected in August 2005
and is
disassembled, ready for shipment.
Downloadable Technical
Drawings (pdf)
•
467'-0" Rail Road Bridge Weight Calculation Spreadsheet
•
Built Up Beam Properties
• General Plan -
1
• Worksheet Calculation -
1 -
2
• Elevation Plan -
1
• Anchor Bolt Plan -
1
• Bents Cap Beams -
1
• Bents Drawings -
1 -
2 -
3 -
4
• Erection Framing Plan -
1 -
2
• Erection Plan for Bents -
1 -
2
• Girder Drawings -
1 -
2
• Girder Elevation Plan -
1
• Cross Girder Details -
1 -
2
• Stringer Drawings -
1 -
2 -
3 -
4
• Diaphragm Details -
1
Please note: Bent 2 of this structure
was consumed and is not available. The steel we are
offering here includes the steel beams from the
foundation to the top of the structural steel (no
piling, no rail and no ties). The structural steel of
Bent 2 is not included in this offer.
Photo
Gallery






Contact Angela Conrad for CAD drawings,
engineering calculations, test reports on the steel and
pricing.
1-800-678-0814
angela@versasteel.com
This information and that on our
website is accurate to the best of our knowledge. We do
not represent this material to be suitable for any
intended purpose. All information including completeness
of inventory and accuracy of drawings and other
information should be verified by any prospective buyer.
Subject to prior sale.